RED AGAVE
All Work
Tiered Corten steel retaining walls with marbled concrete slabs and specimen Whale's Tongue Agaves — Westlake Hills Austin TX
Case Study Westlake Hills, Texas
WH

Westlake Steel

Residence · Westlake Hills, TX Steel retaining walls · Marbled concrete · FCOB lighting · Specimen agaves
Scroll
1/4-inch Corten steel retaining wall with subterranean I-beam posts and deadman anchors — Westlake Hills Austin TX
01 · Corten Steel System1/4" structural / tiered
Poured marbled concrete slab with artisan swirl finish and steel edging — Westlake Hills Austin TX
02 · Marbled Concrete$14/sq ft / artisan finish
24V FCOB silicone tape lighting embedded under Corten steel coping lip — Westlake Hills Austin TX
03 · FCOB Glow Line24V / zero hot spots
Engineering Solution

Structural steel. Not masonry.

Multi-level Corten steel retaining wall system on 8-foot grade decline — Westlake Hills Austin TX
Cantilevered floating concrete steps over gravel bed with concealed steel sub-frame — Westlake Hills Austin TX
Structural · 01 Retaining System 1/4" Corten · Deadman Anchors 1/4-inch heavy-gauge Corten steel plates welded to subterranean I-beam posts set inside 36-inch deep reinforced concrete footers. Horizontal deadman tie-backs extend 6 feet into compacted aggregate. Hydrostatic relief via washed aggregate backfill and solid-core PVC collector pipe network.
Zero Subcontracted Trades
12 days. Turnkey.
System Details

Uncapped Steel Retaining

  • 1/4-inch Corten steel plates, field-welded to I-beam posts
  • 36-inch deep reinforced concrete footers
  • 6-foot deadman anchor tie-backs into compacted aggregate
  • Washed aggregate backfill + PVC hydrostatic relief network

Marbled Concrete + Floating Steps

  • 4-inch poured-in-place marbled concrete slabs ($14/sq ft)
  • Artisan marbled surface finish — high visual contrast against dark aggregate
  • Cantilevered floating steps over lower gravel beds
  • Concealed steel sub-frames beneath each step tread

24V FCOB Lighting

  • IP67 waterproof 24V FCOB silicone tape in milled channels
  • Under steel coping lips + cantilevered step treads
  • ESP32 micro-controller running WLED firmware
  • 2700K warm-white ambient via app-based control

Specimen Botanical Curation

  • Whale’s Tongue Agaves (Agave ovatifolia)
  • Artichoke Agaves (Agave parryi)
  • Mediterranean Fan Palms (Chamaerops humilis)
  • 1-inch Black Star basalt gravel ($390/yard) + 6-inch turf margins
Takeoff / Westlake Hills

The blueprint.

01 / Structural
Steel + Concrete
  • 1/4" Corten steel retaining plates
  • Subterranean I-beam posts
  • 36" reinforced concrete footers
  • 6-ft deadman anchor tie-backs
  • Solid PVC hydrostatic relief lines
  • Flo-Well dry basins
02 / Hardscape
Marbled Concrete
  • 4" poured marbled concrete slabs
  • Cantilevered floating steps
  • Concealed steel sub-frames
  • Bento-box step geometry
  • Black Star basalt gravel beds
  • 6" turf margin borders
03 / Lighting + Flora
FCOB + Agaves
  • IP67 24V FCOB silicone tape
  • ESP32 WLED micro-controller
  • 2700K ambient warm-white
  • Whale’s Tongue Agave specimens
  • Artichoke Agave specimens
  • Mediterranean Fan Palms
Feature / System Material Specification Engineering Class
Retaining System 1/4" Corten Steel Plate + Subterranean I-Beams Structural Civil Engineering
Hardscape Surface Poured-in-Place Marbled Finish Concrete Artisan Architectural Masonry
Linear Lighting 24V FCOB Silicone Tape + ESP32 WLED Controller Smart Low-Voltage Electrical
Subsurface Drainage Solid PVC Lines + Flo-Well Dry Basins Hydro-Engineering Stormwater
Botanical Palette Specimen Agaves, Fan Palms, Black Star Stone Micro-Climate Xeriscaping
Location
Westlake Hills
Build Time
12 Days
Execution
100% In-House
Added Space
1,200 sq ft
Hopeland project preview — Austin TX
Next Project

Hopeland Build.

Continue the journey